Looking into the vast opencast pit. At least nine working locomotives can be seen in this photograph. |
In the background another load of coal can be seen arriving at the screens building whilst SY No.1119 hurries spoil wagons up the bank. |
At the servicing point a JF Class locomotive departs with a crane whilst SY No.1240 approaches the coaling hoppers. |
SY No.0614 preparing to climb out of the pit after stalling and setting back. |
SY No.1449 heading back into the pit having deposited a load of spoil. |
Back to Chinese railways index
Pages last updated 1.5.2006